image
  • Log In
Logo
  • LEADERSHIP
    THE MANAGEMENT STRUCTURE PRINCIPAL PERMANENT SECRETARY THE PERMANENT SECRETARIES Cabinet Secretary
  • PUBLIC ADMINISTRATION
    PUBLIC ADMINISTRATION THE REGULATORY FRAMEWORK OF THE PUBLIC SERVICE PUBLIC SERVICE MANAGEMENT CODE
  • MEDIA
    NEWS PRESS RELEASES PUBLICATIONS PUBLIC SERVICE CAREERS IN Sagħtar MEDIA KIT Take Care
  • CONTACT US
  • image
    INITIATIVES
    Quality Label High Standard of Compliance Rate the Public Service
    Offices involved in management
    PUBLIC SERVICE COMMISSION Coordination and implementation People & standards division Institute for the Public Services Department of Information
  • LEADERSHIP
    THE MANAGEMENT STRUCTURE PRINCIPAL PERMANENT SECRETARY THE PERMANENT SECRETARIES Cabinet Secretary
  • PUBLIC ADMINISTRATION
    PUBLIC ADMINISTRATION THE REGULATORY FRAMEWORK OF THE PUBLIC SERVICE PUBLIC SERVICE MANAGEMENT CODE
  • MEDIA
    NEWS PRESS RELEASES PUBLICATIONS PUBLIC SERVICE CAREERS IN Sagħtar MEDIA KIT Take Care
  • CONTACT US
  • INITIATIVES
    Quality Label High Standard of Compliance Rate the Public Service
  • Offices involved in management
    PUBLIC SERVICE COMMISSION Coordination and implementation People & standards division Institute for the Public Services Department of Information
Back go back

Works Begin on New €75 Million Organic Processing Plant

Date 14.08.2026
Time 5 minutes

Construction has officially begun on Malta’s new Organic Processing Plant, a €75 million investment intended to strengthen the country’s waste-management infrastructure.


Approximately €45 million is being co-financed through the European Union Cohesion Fund. It forms part of Malta’s ongoing national transition towards a circular economy, in which more materials are recovered and organic waste is treated as a resource for the production of energy and compost.


Site mobilisation, excavation and the construction of a perimeter retaining wall are under way. These activities are being carried out while the facility’s engineering, process design and operational requirements are being finalised.


Minister for Energy, the Environment and the Regeneration of the Grand Harbour Miriam Dalli, Minister for European Funds Keith Azzopardi Tanti and WasteServ CEO Richard Bilocca visited the site to review progress. The visit highlighted the facility’s role in recovering resources, generating renewable energy and strengthening the circular economy.


Once operational, the plant will increase Malta’s annual organic waste treatment capacity from approximately 36,000 tonnes to more than 74,000 tonnes. The additional capacity will allow more separately collected organic waste to be treated locally and converted into renewable energy and high-quality compost.


Annual electricity generation is expected to rise from 8.5 GWh to as much as 20 GWh. The facility will incorporate advanced technology and higher levels of automation to improve efficiency, operational performance and environmental safeguards.


Specialised machinery is being used during excavation to reduce noise and vibration. Excavated material is also being reused on site to backfill low-lying areas to the levels required by the design, reducing the need to transport material elsewhere.


The Organic Processing Plant is expected to be completed within two years. It will become a key component of WasteServ’s ECOHIVE strategy and support a more modern and sustainable approach to waste and resource management in Malta.

14.08.2026
Share this article:
  • LinkedIn
  • Facebook
  • Twitter

Other Articles:

Image

40 Civil Protection Officers Deployed to Portugal

Arrow
Image

Building the Workforce Behind Malta’s Tourism Success

Arrow
MORE NEWS More
Logo
  • LEADERSHIP
  • THE PUBLIC SERVICE
  • INITIATIVES
  • OFFICES INVOLVED IN LEADERSHIP
  • MEDIA
  • RECRUITMENTS
  • CONTACT US

Social Media

  • Facebook
  • Instagram
  • X
  • LinkedIn
  • TikTok icon
  • TERMS OF USE
  • PRIVACY POLICY
  • COOKIE POLICY
  • ACCESSIBILITY STATEMENT
This site uses cookies to guarantee you the best experience. If you do not change your settings, we understand that you are accepting the use of cookies automatically. More Information